The Design / Construction Division of the Public Works Department is responsible for the coordination of most street improvement and road construction projects in the City of Raleigh. For information on specific street or sidewalk projects, please see the information listed below, or contact the Design / Construction Division at 919-996-3030.
For information on street resurfacing, view Annual Street Resurfacing or contact the Transportation Field Services Division at 919-996-6446.
Street construction projects that are currently being designed or are under construction are listed below. Information includes the project name, links to additional information, project description, phase of the project, and projected completion date. If you need additional information, please contact the Public Works Department at 919-996-3030.
| Alleghany Drive Petition | Public Hearing Map |
||
| Installation of curb and gutter from Alamance Dr to Yadkin Dr | Construction Contract Awarded |
Late 2012 |
| Anderson Drive Traffic Calming | Area Map | |
||
| Removal of the merge lane from southbound Six Forks Road to westbound Anderson Drive and the construction of a monolithic island west of the intersection with Claremont Road and Oxford Road. |
Construction Contract Awarded |
Late 2012 |
| Buck Jones Road Widening | Project Information | |
||
| Widening to three lanes, bike lanes, curb, gutter and sidewalk on both sides from Farmgate Road to Xebec Way. | Delayed Pending Funding |
To Be Determined |
| Falls of Neuse Realignment and Widening Phase I | Project Information | |
||
| New alignment from Fonville Rd to New Falls of Neuse Rd. | Complete | Opened 10/15/2011 |
| Falls of Neuse Realignment and Widening Phase II | Project Information | |
||
| Widening, curb, gutter, multi-use path and sidewalk from Raven Ridge to Fonville Rd. | Under Construction |
Spring 2013 |
| Freedom Drive / Rhyne Court Petition | Public Hearing Map |
||
| Widening, Curb Gutter and sidewalk on one side from New Bern Ave to the dead end |
Design Phase |
Summer 2013 |
| Greyson Street Petition | Public Meeting Map |
||
| Construction of curb, gutter and sidewalk between Dacian Road and Rose Lane | Design Phase |
Spring 2013 |
| Jones Sausage Road Widening & Realignment | Project Information | |
||
| Widening to a four lane median divided road with curb, gutter and sidewalk from Rock Quarry Rd to I-40. Realignment of the intersection with Rock Quarry Road |
Under Construction |
Early 2013 |
| Lake Wheeler Road Pedestrian and Turn Lane Improvements | Project Information | |
||
| Turn lane improvements and installation of sidewalk and multiuse path on the west side of the road from Centennial Pkwy to Tryon Rd | Final Design / Right of Way Acquisition |
Summer 2013 |
| Leesville Road Widening | Project Information | |
||
| Widening to a four lane median divided road with curb, gutter and sidewalks from I-540 to New Leesville Blvd | Final Design / Right of Way Acquisition |
Spring 2014 |
| Marvino Lane | Public Meeting Map |
||
| New three-lane roadway, including curb, gutter, and sidewalk on the west side from existing Marvino Lane to Glenwood Ave | Design Phase |
Spring 2013 |
| Mitchell Mill Road Widening | Project Information | |
||
| Widening to a four lane median divided road with curb, gutter and sidewalk from Louisburg Road to Watkins Road | Delayed Pending Funding |
To Be Determined |
| Norman Estates Way | Area Map | |
||
| Widen to 26' back to back street with curb & gutter | Design Phase |
Spring 2013 |
| Perry Creek Road Widening | Area Map | |
||
| Widening to a four lane median divided road with curb, gutter and sidewalk from Capital Blvd to Louisburg Rd | Complete | Opened 8/24/2011 |
| Rock Quarry Road Widening Part B | Project Information | |
||
| Widening, curb, gutter and sidewalk from Sunnybrook Rd to Jones Sausage Rd | Under Construction |
Early 2013 |
| Sanderford Road Petition | Public Meeting Map |
||
| Curb, gutter and sidewalk in the area of Elk Park Dr | Design Phase |
Summer 2013 |
| Wade Avenue Improvements | Public Hearing Map |
||
| Curb, Gutter, Sidewalk and Multiuse Path from Faircloth St to Ridge Rd | Under Construction |
Summer 2012 |
Sidewalk construction projects that are currently being designed or are under construction are listed below. Information includes the project name, links to additional information, project description, phase of the project, and projected completion date. If you need additional information, please contact the Public Works Department at 919-996-3030.
| Brooks Ave Petition | Area Map | |
||
| New sidewalk on the east side of the road between Barmettler St and Wade Ave | Under Construction |
Summer 2012 |
| Creedmoor Road | Council Presentation |
||
| Completion of gaps in the sidewalk on both sides of the road from Glenwood Ave and Strickland Rd | Design Phase |
Summer 2013 |
| Calvary Drive | Public Meeting Map |
||
| New sidewalk on both sides of the road from Green Rd to North of Louisburg Rd | Under Construction |
Fall 2012 |
| Falls of Neuse / Wake Forest Road | Public Meeting Map |
||
| New sidewalk on both sides of the road from Hardimont Rd to Bland Rd / Pacific Dr | Under Construction |
Fall 2012 |
| Fox Road |Public Meeting Map |
||
| New sidewalk on the north side of the road from Werribee Dr to I-540 Bridge | Complete |
5/7/2012 |
| Lake Boone Trail | Public Meeting Map |
||
| New sidewalk on the north side of the road from I-440 to Dixie Trail | Under Construction |
Fall 2112 |
| Merwin Road Petition | Area Map | PWC Presentation |
||
| New sidewalk on the west side of the road from Swift Dr to Liles RD | Under Construction |
Summer 2012 |
| New Hope Church Road | Public Meeting Map |
||
| New sidewalk on the south side of the road from Green Rd to Ingram Dr | Under Construction |
Fall 2012 |
| Poole Road | Public Meeting Map |
||
| New sidewalk from Sunnybrook Road to Old Poole Road |
Under Construction |
Fall 2012 |
| Swift Drive Petition | Area Map | |
||
| New sidewalk on the north side of the road from Pineview Dr to Merwin Rd | Design Phase |
To Be Determined |
| Wade Avenue | Public Meeting Map |
||
| New sidewalk on the north side of the road from Dogwood Ln to Hymetus Ct | Under Construction |
Fall 2012 |