Current Street and Sidewalk Projects

Updates for City of Raleigh Street and Sidewalk Improvement Projects

Last Modified: May 14, 2012
Curb & Gutter Construction Along Falls of Neuse Road

The Design / Construction Division of the Public Works Department is responsible for the coordination of most street improvement and road construction projects in the City of Raleigh. For information on specific street or sidewalk projects, please see the information listed below, or contact the Design / Construction Division at 919-996-3030.

For information on street resurfacing, view Annual Street Resurfacing or contact the Transportation Field Services Division at 919-996-6446.

Street Construction Projects

Street construction projects that are currently being designed or are under construction are listed below. Information includes the project name, links to additional information, project description, phase of the project, and projected completion date. If you need additional information, please contact the Public Works Department at 919-996-3030.

Alleghany Drive Petition
|
Public Hearing MapAdobe Acrobat PDF Document | Area Map |
Installation of curb and gutter from Alamance Dr to Yadkin Dr Construction Contract Awarded
Late
2012
Anderson Drive Traffic Calming
|
Area Map |
Removal of the merge lane from southbound Six Forks Road to westbound Anderson Drive and the construction of a monolithic island west of the intersection with Claremont Road and Oxford Road.
Construction Contract Awarded
Late
2012
Buck Jones Road Widening
|
Project Information |
Widening to three lanes, bike lanes, curb, gutter and sidewalk on both sides from Farmgate Road to Xebec Way. Delayed
Pending Funding
To Be
Determined
Falls of Neuse Realignment and Widening Phase I
|
Project Information |
New alignment from Fonville Rd to New Falls of Neuse Rd. Complete Opened
10/15/2011
Falls of Neuse Realignment and Widening Phase II
|
Project Information |
Widening, curb, gutter, multi-use path and sidewalk from Raven Ridge to Fonville Rd. Under
Construction
Spring
2013
Freedom Drive / Rhyne Court Petition
|
Public Hearing MapAdobe Acrobat PDF Document | Area Map |
Widening, Curb Gutter and sidewalk on one side from New Bern Ave to the dead end
Design
Phase
Summer
2013
Greyson Street Petition
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map | Project InformationAdobe Acrobat PDF Document |
Construction of curb, gutter and sidewalk between Dacian Road and Rose Lane Design
Phase
Spring
2013
Jones Sausage Road Widening & Realignment
|
Project Information |
Widening to a four lane median divided road with curb, gutter and sidewalk from Rock Quarry Rd to I-40. Realignment of the intersection with Rock Quarry Road
Under
Construction
Early
2013
Lake Wheeler Road Pedestrian and Turn Lane Improvements
|
Project Information |
Turn lane improvements and installation of sidewalk and multiuse path on the west side of the road from Centennial Pkwy to Tryon Rd Final Design /
Right of Way Acquisition
Summer 2013
Leesville Road Widening
|
Project Information |
Widening to a four lane median divided road with curb, gutter and sidewalks from I-540 to New Leesville Blvd Final Design /
Right of Way Acquisition
Spring
2014
Marvino Lane
| Public Meeting MapAdobe Acrobat PDF Document | City Council PresentationAdobe Acrobat PDF Document | Area Map |
New three-lane roadway, including curb, gutter, and sidewalk on the west side from existing Marvino Lane to Glenwood Ave Design
Phase
Spring
2013
Mitchell Mill Road Widening
|
Project Information |
Widening to a four lane median divided road with curb, gutter and sidewalk from Louisburg Road to Watkins Road Delayed
Pending Funding
To Be
Determined
Norman Estates Way
| Area Map |
Widen to 26' back to back street with curb & gutter Design
Phase
Spring
2013
Perry Creek Road Widening
|
Area Map |


Widening to a four lane median divided road with curb, gutter and sidewalk from Capital Blvd to Louisburg Rd Complete Opened
8/24/2011
Rock Quarry Road Widening Part B
| Project Information |
Widening, curb, gutter and sidewalk from Sunnybrook Rd to Jones Sausage Rd Under
Construction
Early
2013
Sanderford Road Petition
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |
Curb, gutter and sidewalk in the area of Elk Park Dr Design
Phase
Summer
2013
Wade Avenue Improvements
|
Public Hearing MapAdobe Acrobat PDF Document | Area Map |
Curb, Gutter, Sidewalk and Multiuse Path from Faircloth St to Ridge Rd Under
Construction
Summer
2012

Sidewalk Construction Projects

Sidewalk construction projects that are currently being designed or are under construction are listed below. Information includes the project name, links to additional information, project description, phase of the project, and projected completion date. If you need additional information, please contact the Public Works Department at 919-996-3030.

Brooks Ave Petition
|
Area Map |
New sidewalk on the east side of the road between Barmettler St and Wade Ave Under
Construction
Summer
2012
Creedmoor Road
| Council PresentationAdobe Acrobat PDF Document | Public Meeting MapAdobe Acrobat PDF Document | Area Map |
Completion of gaps in the sidewalk on both sides of the road from Glenwood Ave and Strickland Rd Design
Phase
Summer
2013
Calvary Drive
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |Adobe Acrobat PDF Document
New sidewalk on both sides of the road from Green Rd to North of Louisburg Rd Under
Construction
Fall
2012
Falls of Neuse / Wake Forest Road
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |
New sidewalk on both sides of the road from Hardimont Rd to Bland Rd / Pacific Dr Under
Construction
Fall
2012
Fox Road
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |
New sidewalk on the north side of the road from Werribee Dr to I-540 Bridge Complete
5/7/2012
Lake Boone Trail
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |Adobe Acrobat PDF Document
New sidewalk on the north side of the road from I-440 to Dixie Trail Under
Construction
Fall
2112
Merwin Road Petition
|
Area Map | PWC PresentationAdobe Acrobat PDF Document | PWC MinutesMicrosoft Word Document |
New sidewalk on the west side of the road from Swift Dr to Liles RD Under Construction
Summer
2012
New Hope Church Road
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |Adobe Acrobat PDF Document
New sidewalk on the south side of the road from Green Rd to Ingram Dr Under
Construction
Fall
2012
Poole Road
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |
New sidewalk from Sunnybrook Road to Old Poole Road
Under
Construction
Fall
2012
Swift Drive Petition
|
Area Map
|
New sidewalk on the north side of the road from Pineview Dr to Merwin Rd Design
Phase
To Be
Determined
Wade Avenue
|
Public Meeting MapAdobe Acrobat PDF Document | Area Map |
New sidewalk on the north side of the road from Dogwood Ln to Hymetus Ct Under
Construction
Fall
2012